Print
|
||||
Campaign Builder 7.0 User's Guide » Working With Insight Triggers
» Creating an Insight Trigger
» Creating a Triggered Cell
» Configuration
ConfigurationThe Basic Settings are the same as a normal cell except that there is no Scheduled Date. The Advanced Settings are the same. |
||||
| Top of Page | ©2009 e-Dialog. All rights reserved. |
Print
|
||